NECA.html
Gnangara.html

NEWS


KIAB

Power and Drive have recently began works on the Kangaroo Island Abalone farm. This job includes a new main switchboard and an entire control system upgrade to parallel the existing 3 Generators with the Utility Network.


Pier St Telephone Exchange

Power & Drive have recently completed the installation of 2 new 2MVA Caterpillar 3516B Electronic engines fitted with Color screen HMI and control of all engine ancilliaries.


PITC Gnangara

Power & Drive successfully completes control system upgrade at PITC Gnangara Satellite exchange. Have a look at the projects page for more information.


RWWA

Racing & Wagering WA are extremely impressed with the quality of manufacture of their new Essential and Critical Main Switchboards. The Essential Switchboard also encompassed two new backup generators supplied and installed by SE Power.



PITC GNANGARA. WAGnangara.html
Power & Drive Solutions our proud to announce the  successful completion of the PITC Gnangara Emergency Power Plant Control Upgrade Project.

“Transfield Services were extremely impressed with every step of this project. Power & Drive Solutions worked hand in hand with DCE Electrical and the clients (Sentinar and Telstra) to Design, Construct, Install and Commission an advanced up to date Control System to meet the sites P1 critical plant requirements.”

Gnangara.html
On Friday 21st August 2009 Power & Drive Solutions were awarded the state NECA award for Small Contracting Business. We are extremely proud of this award as it is the second such award in the past three years.NECA.html
Home
ProjectsProjects_1.html
About UsAbout_Us.html
Contact UsContact_Us.html

2009

2009

mailto:info@pandds.com.au?subject=Website%20Enquiry
Contact Us via Emailmailto:info@pandds.com.au?subject=Website%20Enquiry
Case Studieshttp://pandds.com.au/Case_Studies/index.html